1) Building with pre-cast concrete elements opens up the opportunity to have a separate production, because the required products can be stored ahead of time, no matter at what stage the construction is.

2) Pre-casting takes place in work sheds and therefore weather conditions are irrelevant

3) Supply can be stocked and only the quantity required will be shifted to the construction site

4) Pre-cast concrete parts have a different rate of production when compared to the in situ construction at site

5) This production technology is extremely precise when it comes to measuring

6) The steel reinforcement can be built exactly to the requirement and therefore used optimally